Arctic LNG Project First Delivery

Arctic LNG Project First Delivery

Approximately 20% of the initial order for dampers have recently been shipped for the Arctic LNG project.

A mixture of Blast Tube Array, Pneumatic Isolation Damper, Marine Fire Damper, Manual Isolation Damper and Volume Control Damper have left Wozair’s UK manufacturing plant and been shipped direct to China where they shall be assembled, before making their way to their final destination.

The initial order was for 1,500 dampers, which then increased as Wozair Asia received another large order on this project for modules.

September 2020

Back to news